WiikHall NEX

The WiikHall NEX is delivered in the sizes 10×24 and 10×32 metres for humanitarian aid and disaster relief projects worldwide.

External shot of two white aid and relief tents from O.B.Wiik on sand.
External shot of three white aid and relief tents from O.B.Wiik.
External shot of four white aid and relief tents from O.B.Wiik, each shelter has a blue world food programme logo to the side.
Aerial shot of several white aid and relief tents on a harbour from O.B.Wiik. Each building has blue world food programme logos on the roofs and to the side. There is

Simple & rapid setup

The WiikHall NEX is designed for easy assembly without the need for specialized tools like cranes or lifts. Included in the delivery are all necessary tools and detailed instructions, allowing a six-person team to efficiently set up a hall in just one day. This ease of assembly is crucial in disaster relief and humanitarian aid situations, where time is of the essence.

Quick delivery for emergency response

O.B.Wiik maintains ready stock of halls for swift delivery, essential for UN, WFP, UNICEF, and NGO operations in emergency relief scenarios. A single 20′ container can hold up to 6 halls of 10×24 meters or 5 halls of 10×32 meters, ensuring rapid deployment to aid sites.

Versatile utility in disaster relief

The building are multifunctional, serving as storage for food and emergency supplies like blankets and water tanks, and can also be utilized as workshops, schools, or infirmaries. Their adaptability makes them invaluable in various contexts of aid and relief, disaster response, and humanitarian efforts.

With a presence in over 100 countries and having delivered more than 10,000 units since the late ’80s, the WiikHall model NEX is a trusted choice among major UN organizations and NGOs. This extensive experience underscores the reliability and effectiveness of WiikHall NEX in diverse global emergency situations.

WiikHall NEX’s innovative design for aid efficiency

The aluminum structure of WiikHall NEX offers lower weight than steel, significantly cutting airfreight costs. Its cladding, weighing just 56 kg and spanning 4 meters, is easy to handle and install. Modular in design, the building’s length can be adjusted with interchangeable parts, and all assembly is conducted at ground level for safety. In case of damage, only the affected roof section needs replacement, ensuring quick and cost-effective repair. This hall’s design prioritizes safety, efficiency, and flexibility, making it an ideal solution for rapid emergency relief and humanitarian aid operations.

Aerial shot of several O.B.Wiik aid and relief tents from O.B.Wiik.
An internal shot of a white aid and relief shelter from O.B.Wiik filled with sand bags.
External shot of white aid and relief tent from O.B.Wiik. The door to the tent is open and there are storage boxes inside.

Video assembly guide

Watch the videos below to see the straight-forwards steps to setting up a WiikHall NEX. With a team of 7 people, it took a little over 3 hours to assemble.

Technical specifications

WiikHall Model NEX with aluminium frame.

Framework: Anodized Aluminium.

Cover: White PVC-coated polyester fabric with UV protection.

One fabric folding door 4.5 x 4 metres (WxH) in each end.

Ventilation

Two air vents in each gable.

Wind load capacity: 0,68 kN/m2 (approx. 31 m/s) when the building is attached to the ground in accordance with the assembly instructions.

Snow load capacity: 0,75 kN/m2 when the building is attached to the ground in accordance with the assembly instructions.

Testimonials

“UNICEF and O.B.Wiik AS have an ongoing signed Long Term Agreement against which O.B.Wiik is supplying prefabricated warehouses for use in UNICEF’s operations worldwide. The focal person at O.B.Wiik AS has always been very helpful in providing information promptly and suggesting solutions for getting the products to the destination promptly.”

Samuel Kweku Ocran
Contracts Manager, UNICEF Supply Division

Testimonials

“UNHCR is in contractual relationship with company O.B.Wilk AS for more than 20 years for the provision of prefabricated warehouses (WikHall Aluminium structure 10 x 24 m). Up to date, the requirements have been delivered according to the contractual terms, there are no issues on record regarding the fulfilment of the purchase orders.”

Fabrizio Bertora
Senior Supply Officer, UNHCR

Testimonials

“The United Nations World Food Programme has been procuring from O.B.Wiik for more than 20 years. Since 1997 O.B.Wiik has had a Long Term Agreement with WFP supplying Mobile Storage Tents to all WFP’s operations world-wide. The agreement has been extended every 4 years after completion of an international competitive bidding process. WFP is satisfied with quality of the goods and services received from O.B.Wiik and there have not been any disputes between World Food Programme and O.B.Wiik on the goods and services provided.”

Andrew Lukach
Chief of Procurement, World Food Programme

Get in touch

Tell us how we can help with your project. Fill out this quick form, send us an email, or give us a call and the O.B.Wiik team will get back to you shortly.

+47 64 83 55 00
export@obwiik.com

Contact

"*" indicates required fields

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.