Skip to content

Slagelse will renew their swimming pool – and O.B.Wiik is on the team

It is a complicated project, but O.B.Wiik is always interested in a challenge. It is also one of the reasons why we were chosen when the Swimming Hall in Slagelse was to be renovated. We have set up a covered hall that is 40 meters wide and 85 meters long and up to 17 meters high at the top. The inside of the swimming pool is also well covered to prevent damage. In other words, it is not a small party tent.

You are currently viewing a placeholder content from Default. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More Information

Main contractor and managing director of Georg Berg, Christian Berg, tells about several advantages of using the cover from O.B.Wiik. The large black cover protects against rain and wind. Work on the swimming pool can therefore go ahead, unaffected by the weather. It provides good predictability and good working conditions on the inside.

Good working conditions are also provided by the light installed in the ceiling, which ensures a well-lit workplace. Especially important as we enter the darker months. In addition to protection, there is also free space at one end of the hall. This is very practical as you can use this area for crane and lifting work. As well as a storage place for building materials, which can be safely protected while the work is in progress.

Throughout the project, there has been good and productive collaboration between Slagelse municipality and Georg Berg and O.B.Wiik. And we are proud and happy to be involved in giving Slagelse a new swimming hall.